The municipality of Ormstown is working with the Ministère des Transports et de la Mobilité Durable (MTQ) to study four busy intersections, following concerns raised by the council over safety.
Mayor Philippe Besombes first met with the regional directorate for the transport ministry’s Montérégie office in April to discuss road safety in the municipality. During a recent follow-up meeting, it was agreed that improvements were needed but that more concrete information was necessary before any decisions could be made.
As a result, the municipal council adopted a resolution on Oct. 6 to mandate the GBI consulting and engineering firm to carry out a comprehensive traffic study for four intersections at a cost of just over $54,772.
“We are going to look at the four involving the MTQ,” said Besombes, who confirmed the study will focus on the intersections between the Highway 138 and Route 201, Highway 138 at the Chemin de la Rivière aux Outardes and Roy Street, Highway 138A and Gale Street, and where Gale Street meets Church Street.
“It is not just a snapshot – it’s a study,” said Besombes, who explained that along with traffic counts for passenger vehicles and commercial trucks, the study will also consider the overall picture, including elements such as lane width and fluidity, as well as pedestrian and cyclist safety. The study will also factor in seasonal peaks in traffic stemming from the Lac des Pins campground, the fall tourism season, or major events taking place within the village.

“All of this fits into our vision of truly addressing safety issues at our provincial road intersections,” said Besombes, who is confident that the council will play a role in influencing decisions despite the municipality’s lack of authority over these intersections. “Our relationship with the MTQ is very good right now. They are open to us making proposals, and they are open to us finding solutions together,” he explained, while acknowledging that many of the factors that contribute to increasing traffic are beyond the municipality’s control.
“It is my job to ensure we make it safe and limit the impacts,” said Besombes. “I don’t want to wait for an accident to happen before taking action,” he added, pointing out a fatal collision had already taken place over a decade ago at one of the intersections now being studied.
Besombes is also hoping the study will present opportunities to unite the south and north sides of the village. “We need to stop talking about sides here. It should be the same downtown, but a provincial highway running through the centre creates challenges,” he said. “Businesses have sprung up in the southern part. I am seeing more and more people who want to cross on foot, but it is dangerous right now,” he added. “We need to fix this.”

