Sarah Rennie
The third-floor nurses’ station at the Barrie Memorial Hospital in Ormstown recently underwent a massive transformation.
According to Catherine Brousseau, an information officer for the Montérégie-West Integrated Health and Social Services Centre (CISSSMO), the renovations were part of a “planned and anticipated project” that predates COVID-19. The overall cost of the project is valued at approximately $325,000.
“This new station will allow us to use better computer technology with a large screen at the station to monitor bed management,” she explains. Brousseau notes that the upgrades also include the construction of a closed workstation for doctors, and a new pharmacy that will allow for improvements in the monitoring of infection prevention and control instructions.

The new design also includes a protruding counter with windows installed on both sides separating the station from the corridor, to allow for improved confidentiality during exchanges that may take place between visitors and nurses.
“Although the project is not related to the pandemic, we have been able to install plexiglass to ensure social distancing is respected within this new working environment,” says Brousseau.
The Women’s Auxiliary of the Barrie Memorial Hospital was quick to celebrate the new station on its Facebook page, even though it was not asked to contribute any funds toward the project. In a post featuring several photographs of the new workspace, the Women’s Auxiliary wrote: “The transformation is amazing. Although COVID has made things tough, our local hospital continues to soldier on!”

